Alumiworks
Access your lift and board your vessel more easily with an aluminum walk board.
PICK-UP ONLY.
Aluminum guide post brackets fit bottom I-beams and hold guide pipes to help protect your lift.
Dock steps which provide easier access to your lift or vessel.
Mount boat lift bunks with universal aluminum bunk brackets.
Access and maintain a boat lift easily with an aluminum stern platform.
PICK-UP ONLY.
Connect a floating dock to a dock or seawall with a support pipe.
Pre-built floating dock topped in Trex Enhance basics decking and wooden frame. Easy to install using one of our many mounting options!
***Please allow a lead time of up to 2 weeks for completion.***
Standard hardware for Aluminum guide post/pipe bracket.
3'x12' Floating dock ramp with composite decking , includes hardware and handrail.
***Please allow a lead time of up to 2 weeks for completion.***
Build or repair a floating dock gangway/ramp with a floating dock ramp hinge.
Pre-built floating dock topped in wood decking and wooden frame. Easy to install using one of our many mounting options!
***Please allow a lead time of up to 2 weeks for completion.***
Fits into standard guide post brackets, acting as a PVC stiffener and provides additional weight to prevent bottom lift cradle from floating.